Space cleanroom

Since May 2026, assembly, integration and environmental testing of our flight hardware take place in our own ISO class 7 cleanroom in Košice.

Infrastructure·Facility

Why a cleanroom

Flight electronics most often fail through contamination and electrostatic discharge: a particle bridges two pads, or an unnoticed discharge damages a junction that later fails in orbit. Neither can be repaired after launch, so the environment is controlled — particle count, temperature, humidity and electrostatic charge.

The room has 25 m² at ISO class 7, with an ISO class 5 laminar box for the most sensitive work. Personnel enter through an air shower, material through a 60 × 60 cm pass-box, and the room is kept at overpressure. Processes follow ECSS, the standards used in ESA projects.

Until 2026, formal test campaigns had to be carried out elsewhere; they now take place in Košice.

A person in white cleanroom garb working at the laminar box inside the cleanroom.
Work in the ISO class 5 laminar box. Personnel enter through an air shower; material comes in through a 60 × 60 cm pass-box.Department of Space Physics, IEP SAS

Electronics assembly and inspection

The room is equipped for hand work on flight hardware and for looking at it closely afterwards.

SolderingProfessional soldering workstations
MicroscopyDRV-Z1 3D stereo digital microscope
Joint inspectionErsascope X Inspection System
MeasurementOscilloscopes, power supplies, precision multimeters, function generator, counter
WeighingAnalytical precision balance

The Ersascope inspects, from the side, solder joints hidden under components.

Vibration testing

The shaker reproduces launch loads and exposes weak joints, loose connections and resonances before launch.

SystemBrüel & Kjær LDS V780 shaker, HPA-K amplifier (5 kVA, class D)
FrequencyDC – 4000 Hz
Sine force5120 N peak
Random force4230 N rms
Sine acceleration1089 m·s⁻² (111 g) peak, bare armature
Random acceleration480 m·s⁻² rms
Velocity1.9 m·s⁻¹ peak
Displacement25.4 mm peak-to-peak
Moving element mass4.7 kg
Control24-bit digital control, IEPE accelerometers
High-speed imagingChronos 2.1-HD camera

Maximum system ratings. The usable test envelope depends on payload mass, fixture dynamics, axis and frequency.

Thermal-vacuum testing

The SPACEVAC chamber combines vacuum with temperature cycling to verify thermal design and survival across the full temperature range before flight.

Hardware inside is cycled between −100 °C and +160 °C in vacuum, down to 1 × 10⁻⁷ mbar (empty chamber, +25 °C), and exercised over its flight interfaces while the test runs.

A stainless steel thermal-vacuum chamber on a blue frame beside a rack of laboratory instruments.
The SPACEVAC chamber and its instrument rack.Department of Space Physics, IEP SAS
ChamberVakuum Praha SPACEVAC, 150 L bell chamber
Thermal interfaceØ 450 mm temperature-controlled copper base plate, radiation shroud
Temperature−100 °C to +160 °C
Vacuum1 × 10⁻⁷ mbar (empty chamber, +25 °C)
PumpingVarian SH-110 dry scroll pump, Varian V301 Navigator turbomolecular pump
Pressure measurementTPG 261 controller, PKR 251 FullRange gauge (Pirani + cold cathode)
Temperature loggingUp to 16 PT1000 channels
Feedthroughs2 × 32 pins + 4 HV pins at the base, 9 pins in the upper bell

The chamber has flight heritage: the Anti-Coincidence Module for JUICE was tested in it before delivery to IRF Kiruna. It now stands in the cleanroom.

Test automation and interfaces

Tests are automated with National Instruments modules for temperature, voltage, digital inputs and outputs, and relays.

Units under test connect over flight buses — SpaceWire, MIL-STD-1553, Ethernet, CAN and RS-485/422 — and can be operated during chamber and shaker tests.

Opened in May 2026

The cleanroom opened officially on 14 May 2026 as the first space cleanroom in Slovakia, built with support from TIK STEPHANIK — the satellite platform consortium we are part of — and SAV OPEN LABS, both funded by the European Union.

The first scientific apparatus from our department flew into space in 1977. Since then we have contributed to more than 25 space missions. The new space cleanroom, with ISO class 7 air cleanliness, opens the door to taking part in the most demanding ESA projects — and it lets us carry out the critical phases of development and testing here at home.

Šimon Mackovjak, Head of the Department of Space Physics, IEP SAS

The opening was attended by guests from the Slovak Academy of Sciences, the STEPHANIK project consortium, the East Slovak Space Cluster, the Slovak Space Office, and partner universities and companies.

Working with us

Capacity is divided three ways. The facility serves the space programme of IEP SAS first. A share is reserved for joint scientific and technological projects. A further share is available for commercial hire.

If you are developing hardware that needs ISO class 7 assembly, vibration qualification or thermal-vacuum testing — as a research partner or as a customer — write to space-lab [at] saske.sk.

Talk to us about access

Tell us what you need to measure or test. Both facilities are open to partners under SAV OPEN LABS (2026–2029, Programme Slovakia 2021–2027 · ERDF); hosting at Lomnický štít and use of the cleanroom are agreed case by case.

Contacts for cooperation →